In today’s SAP SD Training class, we have discussed the business significance of SAP Schedule line category and the important controls behind them. If you are interested in SAP CRM Training, please click on the respective link to get more details.

Summary : We have discussed the following most important controls behind a schedule line category and have seen working demos for the same in the SAP system. We have also discussed the SAP Schedule line category determination, the fields involved (Sales Item Category and MRP Type )  and the source for the same fields.

  1. Delivery Block
  2. Movement Type
  3. Delivery Relevance
  4. Purchase Order Type ( For external Procurement )
  5. Requirements Transfer to MRP
  6. Availability Check

The Menu path to configure the SAP Schedule Line Category is [ spro -> IMG -> Sales & Distribution -> Sales -> Sales Documents -> Schedule Lines ] or use the Transaction code [ VOV6 ]. Detailed notes on SAP Schedule Line Category are available .

Questions :

  1. Configure a new schedule line category say ‘Zx’ as a copy of the standard schedule line category ‘CP’  ?
  2. Configure the schedule line category ‘Zx’ you have created in Q.1 above to be determined manually for sales item category TAN and material M-01.
  3. Create a standard sales order for a material M-01 and change the schedule line category to ‘Zx’ and write down the standard order
  4. Create a material similar to M-01 using the SAP Material Master ( This time without a MRP Type ) and create another standard order with the new material and identify the schedule line category determined by default. Explain the reasons for the determination.  ( Hint: If the material is not in the SAP Material Listing and Exclusion, please add the same)
  5. Deliver the order you have created in Q. 4 above and write down the Movement type associated with the corresponding item in the delivery .
  6. Give the goods movement type associated with the SAP Sales Order # 4969 , Item No. 10
  7. Can you determine if the line item.10 of the Sales Order # 4969 is externally procured or sent from our own warehouse ? Give the reasons for your answer.
  8. Can you find out the Movement type associated with Line Item. 10 of the SAP Sales Order # 4969 directly from the Sales Order without going to the Goods Issue Document  ?
Advertisements

38 thoughts on “SAP Schedule Line Category – SAP SD Training – Jan 2011 Batch

  1. srijyo says:

    Q4) Default SchLc ‘CN’ is selected as per setting in V0V5 (TAN- ND- CN)

    Q5)Movement type is 601.

    Q6) Movement type is 601
    Q7) Purchase requisition # is not assigned to schedule line items so this Material is not externally procured.
    Q8)Yes, from procurement tab in schedule lines.

    Like

  2. yogesh says:

    1) CP copied to ZX
    2) ZX manually determined to for material M-01 tan+nd
    3) 14012 sales order
    4) 14018 sales order tan+cp
    7) No , procurement is not done for the item delivered 07.01.1997
    8) 601 double click on CP and select procurement we can see the movement type

    Like

  3. iyershivkumar17 says:

    Answers:

    1. Configure a new schedule line category say ‘Zx’ as a copy of the standard schedule line category ‘CP’ ?

    Ans. Have created a schedule line category ZT.

    2. Configure the schedule line category ‘Zx’ you have created in Q.1 above to be determined manually for sales item

    category TAN and material M-01.

    Ans. Done

    3. Create a standard sales order for a material M-01 and change the schedule line category to ‘Zx’ and write down the

    standard order

    Ans. 16097

    4. Create a material similar to M-01 using the SAP Material Master ( This time without a MRP Type ) and create another

    standard order with the new material and identify the schedule line category determined by default. Explain the reasons

    for the determination. ( Hint: If the material is not in the SAP Material Listing and Exclusion, please add the same)

    Ans. Have created item S-01, but have problems with listing.

    5. Deliver the order you have created in Q. 4 above and write down the Movement type associated with the corresponding

    item in the delivery .

    Ans. Dependent on the above.

    6. Give the goods movement type associated with the SAP Sales Order # 4969 , Item No. 10

    Ans. 601

    7. Can you determine if the line item.10 of the Sales Order # 4969 is externally procured or sent from our own

    warehouse ? Give the reasons for your answer.

    Ans. It is sent from our own warehouse as the item category is TAN, if it was externally procured then the item

    category should have been TAS.

    8. Can you find out the Movement type associated with Line Item. 10 of the SAP Sales Order # 4969 directly from the

    Sales Order without going to the Goods Issue Document ?

    Ans. Yes, 601 (Item View-> Schedule Lines ->Procurement)

    Like

  4. iyershivkumar17 says:

    Answers:

    1. Configure a new schedule line category say ‘Zx’ as a copy of the standard schedule line category ‘CP’ ?

    Ans. Have created a schedule line category ZT.

    2. Configure the schedule line category ‘Zx’ you have created in Q.1 above to be determined manually for sales item category TAN and material M-01.

    Ans. Done

    3. Create a standard sales order for a material M-01 and change the schedule line category to ‘Zx’ and write down the
    standard order

    Ans. 16097

    4. Create a material similar to M-01 using the SAP Material Master ( This time without a MRP Type ) and create another
    standard order with the new material and identify the schedule line category determined by default. Explain the reasons for the determination. ( Hint: If the material is not in the SAP Material Listing and Exclusion, please add the same)

    Ans. Have created item S-01, but have problems with listing.

    5. Deliver the order you have created in Q. 4 above and write down the Movement type associated with the corresponding
    item in the delivery .

    Ans. Dependent on the above.

    6. Give the goods movement type associated with the SAP Sales Order # 4969 , Item No. 10

    Ans. 601

    7. Can you determine if the line item.10 of the Sales Order # 4969 is externally procured or sent from our own warehouse ? Give the reasons for your answer.

    Ans. It is sent from our own warehouse as the item category is TAN, if it was externally procured then the item
    category should have been TAS.

    8. Can you find out the Movement type associated with Line Item. 10 of the SAP Sales Order # 4969 directly from the Sales Order without going to the Goods Issue Document ?

    Ans. Yes, 601 (Item View-> Schedule Lines ->Procurement)

    Like

  5. shambhavi gupta says:

    1. Configure a new schedule line category say ‘Zx’ as a copy of the standard schedule line category ‘CP’ ?
    A. Created Z1

    2. Configure the schedule line category ‘Zx’ you have created in Q.1 above to be determined manually for sales item category TAN and material M-01.
    A. TAN + ND = CN (Manually assigned= Z1)

    3. Create a standard sales order for a material M-01 and change the schedule line category to ‘Zx’ and write down the standard order
    A. Order # 16098

    4. Create a material similar to M-01 using the SAP Material Master ( This time without a MRP Type ) and create another standard order with the new material and identify the schedule line category determined by default. Explain the reasons for the determination. ( Hint: If the material is not in the SAP Material Listing and Exclusion, please add the same)
    A. Created Material M-SG and listed too…but not being able to create the order(shows error on plant number)
    Schedule line category determined would be CP as default category relevant for all controls for schedule line category.

    5. Deliver the order you have created in Q. 4 above and write down the Movement type associated with the corresponding item in the delivery .
    A. Dependent on previous question.

    6. Give the goods movement type associated with the SAP Sales Order # 4969 , Item No. 10
    A. 601

    7. Can you determine if the line item.10 of the Sales Order # 4969 is externally procured or sent from our own warehouse ? Give the reasons for your answer.
    A. Because the schedule line category is CP and line item category is TAN, therefore it is sent from our own warehouse. If its TAS or CS then its third party.

    8. Can you find out the Movement type associated with Line Item. 10 of the SAP Sales Order # 4969 directly from the Sales Order without going to the Goods Issue Document ?
    A. Yes…Schedule line>> shipping>> procurement.

    Like

  6. Roji says:

    1. RM
    2. Done
    3. Order# 16102
    4. I was unable to do this, and need help
    5. Dependent on # 4
    6. 601
    7. Item 10 was sent from our warehouse. There are a few ways to determine, the first is there was a delivery associated with it, and a picking request shown in document flow (if we did not stock the items then none of this would be visible from our end). Secondly in the schedule lines tab the schedule line category is ‘CP’. Thirdly the item category is ‘TAN’
    8. Yes, schedule lines for item > Procurement Detail

    Like

  7. Mark says:

    Answers :
    A. Created schedule line cat ‘Z5’.
    B. I am not quite sure what needs to be done here. Please give me some direction on this.

    F. Movement Type 601.
    G. The item category is TAN so the material is sent from our warehouse. Item category TAS is a ‘Drop Ship’ item category.
    H. Yes, item -> Schedule lines -> Procurement

    Like

      • Mark says:

        Thanks for the help Siva.

        C. Order # 13477 was created.
        D. Created material number M-MA.

        I am getting the following error message when trying to create a sales order with the new material number M-MA, The error mesage states: “Material M-MA is not defined for sales org.1000, distr.chan10, language DE”. Where do I need to define this material number?

        Like

  8. Raj says:

    Ans-A: Created Schedule line category “ZX”

    Ans-B: Determined Schedule line category.

    Ans-C: ZOR Order 13913 has been saved

    Ans-D: If the material is not created with MRP type then the determination will be purely based on Item Category.

    Ans-E: Tried to deliver but there is not stock.

    Like

  9. karthik says:

    A. created zk
    b.Done
    c.created order no 13918
    D.created material m-10 and created order getting schedule item category as cp becoz the line item type was Tan
    E.movement type is 601
    F. material movement type is 601
    G.material has been sent from our warehouse as there is no purchase order generated and also schedule line item cat is cp
    H.yes from schedule lines -shipping-procurments

    Like

  10. Navdeep says:

    A.Configure a new schedule line category say ‘Zx’ as a copy of the standard schedule line category ‘CP’ ?
    YN

    B.Configure the schedule line category ‘Zx’ you have created in Q.1 above to be determined manually for sales item category TAN and material M-01.
    Line Item Category + MRP Type = Schedule Line Category
    TAN + PD (found by going to the MRP1 tab of M-01 (using comand MM02)) = YN
    Added YN to be manual option for TAN+PD combo.

    C.Create a standard sales order for a material M-01 and change the schedule line category to ‘Zx’ and write down the standard order
    Order Number: 14014

    D.Create a material similar to M-01 using the SAP Material Master ( This time without a MRP Type ) and create another standard order with the new material and identify the schedule line category determined by default. Explain the reasons for the determination. ( Hint: If the material is not in the SAP Material Listing and Exclusion, please add the same)
    NAV_SCH_LIN_CAT
    when I tried creating order (order type OR) for sales org 1000, dist chnl 10 – got an error that the material does not exist for this sales org and dist channel and language DE.
    re-created NAV_SCH_LIN_CAT using MM01 for above sales org
    Schedule Line Category is CP
    Order# 14018
    If the item category is TAN and MRP Type is ‘blank’ – schecule line category is CP

    E.Deliver the order you have created in Q. 4 above and write down the Movement type associated with the corresponding item in the delivery .
    – Create delivery using VL01N
    – when I tried creating delivery for 14018, got the error message that the delivery cannot be created because the order is incomplete
    – went back to the order and found that the storage location was not assigned to the Plant, tried some random storage locations (didn’t work). went to SPRO->SAP Reference IMG->Enterprise Structure->Assignment->Logistics Execution->Assign warehouse number to plant/storage location. went to Plant 1200 and found matching Storage Location
    – went back to the order and entered storage location 0001
    – got the error message NAV_SCH_LIN_CAT does not exist in storage location 1200 0001. Looked at SAP SD troubleshooting links (put by Siva) – How to input stock into SAP – Jan 2011 SAP Training Batch. entered the stock quantity
    of 10 (changed by system to 10,000) using T-code MB1C
    – Got an error message (Accounting data not yet maintained for material 1200 NAV_SCH_LIN_CAT)
    SIVA – NEED HELP FROM THIS POINT ONWARDS

    F.Give the goods movement type associated with the SAP Sales Order # 4969 , Item No. 10
    Movement Type – 601. went to VA03 and entered order number. double clicked on line item 10. double clicked on delivery line item and went to the Procurement Tab to check Movement Type

    G.Can you determine if the line item.10 of the Sales Order # 4969 is externally procured or sent from our own warehouse? Give the reasons for your answer.
    It was procured from our Plant:
    Plant/ Stge Loc: 1000 (internal)
    Route R00040 (we only define route for items we are shipping)
    No Purchase Order raised under the Purchase column

    H.Can you find out the Movement type associated with Line Item. 10 of the SAP Sales Order # 4969 directly from the Sales Order without going to the Goods Issue Document?
    Yes

    Like

  11. Sahil says:

    Questions :
    A.Configure a new schedule line category say ‘Zx’ as a copy of the standard schedule line category ‘CP’ ?
    Answer: new schedule line category ” YM ”

    B.Configure the schedule line category ‘Zx’ you have created in Q.1 above to be determined manually for sales item category TAN and material M-01.
    Answer: Item category + MRP type = schedule line category – TAN + PD = ZM

    C.Create a standard sales order for a material M-01 and change the schedule line category to ‘Zx’ and write down the standard order
    Answer: SAles order 14266

    D.Create a material similar to M-01 using the SAP Material Master ( This time without a MRP Type ) and create another standard order with the new material and identify the schedule line category determined by default. Explain the reasons for the determination. ( Hint: If the material is not in the SAP Material Listing and Exclusion, please add the same)
    Answer: Sales Order : 14267 – Material = Material 2

    E.Deliver the order you have created in Q. 4 above and write down the Movement type associated with the corresponding item in the delivery .
    Answer: Delivery = 80016660 – Movement type = 601

    F.Give the goods movement type associated with the SAP Sales Order # 4969 , Item No. 10
    Answer: Movement type = 601

    G.Can you determine if the line item.10 of the Sales Order # 4969 is externally procured or sent from our own warehouse ? Give the reasons for your answer.
    Answer: The schedule line category is CP and line item category is TAN

    H.Can you find out the Movement type associated with Line Item. 10 of the SAP Sales Order # 4969 directly from the Sales Order without going to the Goods Issue Document ?
    Answer: PATH—Goto–item–schedule lines NOW LOOK AT THE BOTTOM OF THE DOCUMENT THREE TABS Sale–Shipping–Procurement CHOOSE the Procurement tab — you can find movement type 601

    Like

  12. Gautam says:

    Answer-A

    schedule line category ZG created

    Answer-B

    ZG is assigned to item category TAN and MRP type =PD as an additional schedule line category

    Answer-C

    Answer- standard order 13530/OR created with schedule line category ZG

    Answer-F

    goods movement type is 601 GD Goods issue delivery

    Answer-G

    Line item 10 of the Sales Order # 4969 is sent from our own warehouse.as the purchase order no under the ‘scheduled lines’ is blank.The set up related to the schedule line is also set up as TAN+CP. For the external purchase it has be TAS+CS, CS schedule line cate has the order type set up as NB Purch.requis. Stand.

    Answer-H

    diplay item details—-schedule lines—-procurement——movement type–601

    Like

  13. Gautam says:

    Can you please help to answer the question-D

    CREATE A MATERIAL -M-01….This time without a MRP Type ) and create another standard order with the new material and identify the schedule line category determined by default. Explain the reasons for the determination. ( Hint: If the material is not in the SAP Material Listing and Exclusion, please add the same)

    Like

  14. Gautam says:

    Effect of the conversion of Item category from TAN to TAS

    Order No—13683/OR created

    when I converted the TAN to TAS—I got the purchase requistion screen to enter the required filed like price of the item, and save the order, I got the po no also..10013852, under schedule lines screen for the order…..the schedule line catgory also changed to CS. This PO wiil be sent thru EDI to the third party..

    Like

  15. Gautam says:

    Answer -D

    schedule line catergory by default came as ND.
    Order No–13698 created.
    schedule category–CN–NO MRP

    ANSWER-E

    Delivery no 80016418 created.Movement type is 601

    Like

  16. Zahid Abbas says:

    A.Configure a new schedule line category say ‘Zx’ as a copy of the standard schedule line category ‘CP’ ?

    Created zx by copying “CP”

    B.Configure the schedule line category ‘Zx’ you have created in Q.1 above to be determined manually for sales item category TAN and material M-01.

    Did it.

    C.Create a standard sales order for a material M-01 and change the schedule line category to ‘Zx’ and write down the standard order

    Order # 14036

    D.Create a material similar to M-01 using the SAP Material Master ( This time without a MRP Type ) and create another standard order with the new material and identify the schedule line category determined by default. Explain the reasons for the determination. ( Hint: If the material is not in the SAP Material Listing and Exclusion, please add the same)

    E.Deliver the order you have created in Q. 4 above and write down the Movement type associated with the corresponding item in the delivery .

    Movement type = 601

    F.Give the goods movement type associated with the SAP Sales Order # 4969 , Item No. 10

    It is 601 as well.

    G.Can you determine if the line item.10 of the Sales Order # 4969 is externally procured or sent from our own warehouse ? Give the reasons for your answer.

    It is send from our own warehouse. The item category “TAN” tells us plus the shedule line “CP”.

    H.Can you find out the Movement type associated with Line Item. 10 of the SAP Sales Order # 4969 directly from the Sales Order without going to the Goods Issue Document ?

    Right underneath the sales order….there atr three tabs with magnifying glass on them….the last of them is procurement tab…..through this tab we can check the movement type.

    Like

  17. shyam says:

    Hi Sir,
    Here are my answers, Pls review and let me know if I am wrong somewhere..Thanks..
    ———————————————————————————————————-
    1. Configure a new schedule line category say ‘Zx’ as a copy of the standard schedule line category ‘CP’ ?

    Created ZS by copying CP
    ———————————————————————————————————-
    2. Configure the schedule line category ‘Zx’ you have created in Q.1 above to be determined manually for sales item category TAN and material M-01.

    Assigned ZS for TAN and PD
    ———————————————————————————————————-
    3. Create a standard sales order for a material M-01 and change the schedule line category to ‘Zx’ and write down the standard order

    Standard order #14075
    ———————————————————————————————————-
    4. Create a material similar to M-01 using the SAP Material Master ( This time without a MRP Type ) and create another standard order with the new material and identify the schedule line category determined by default. Explain the reasons for the determination. ( Hint: If the material is not in the SAP Material Listing and Exclusion, please add the same)

    For Item category TAN , Default Schedule Category is CP
    ———————————————————————————————————-
    5. Deliver the order you have created in Q. 4 above and write down the Movement type associated with the corresponding item in the delivery .

    Movement type 601
    ———————————————————————————————————-
    6. Give the goods movement type associated with the SAP Sales Order # 4969 , Item No. 10

    Movement type 601
    ———————————————————————————————————-
    7. Can you determine if the line item.10 of the Sales Order # 4969 is externally procured or sent from our own warehouse ? Give the reasons for your answer.

    Schedule line Category CP determines that it is sent form our own warehouse.
    ———————————————————————————————————-
    8. Can you find out the Movement type associated with Line Item. 10 of the SAP Sales Order # 4969 directly from the Sales Order without going to the Goods Issue Document ?

    Yes by clicking procurement tab in schedule line.
    ———————————————————————————————————-

    Like

  18. khawar says:

    1. Schedule line “YC” is created
    2. Schedule line “YC” is configured for Item Category “ZAAN”
    3. SO 14085 created showing my schedule line “YC”
    4. The schedule line is “CP” because we copied it and it is inheriting properties from its parent category
    5. Movement type “601”
    6. Item # 10 is not externally procured the reason is its item category is TAN and Schedule line type CS
    7. Yes we can in SO click Item details button and then procurement there u can see movement type

    Like

  19. jitesh says:

    A.Configure a new schedule line category say ‘Zx’ as a copy of the standard schedule line category ‘CP’ ?
    Answer: new schedule line category : ZJ copying from

    B.Configure the schedule line category ‘Zx’ you have created in Q.1 above to be determined manually for sales item category TAN and material M-01.
    Answer: Item category + MRP type = schedule line category
    TAN + PD = ZJ

    C.Create a standard sales order for a material M-01 and change the schedule line category to ‘Zx’ and write down the standard order
    : SAles order 14088

    D.Create a material similar to M-01 using the SAP Material Master ( This time without a MRP Type ) and create another standard order with the new material and identify the schedule line category determined by default. Explain the reasons for the determination. ( Hint: If the material is not in the SAP Material Listing and Exclusion, please add the same)
    Answer:

    Material M123456 created and added as well. Schedules category is determined CP .

    E.Deliver the order you have created in Q. 4 above and write down the Movement type associated with the corresponding item in the delivery .
    Answer: Delivery = 80016538 – Movement type = 601

    F.Give the goods movement type associated with the SAP Sales Order # 4969 , Item No. 10
    Answer: Movement type = 601

    G.Can you determine if the line item.10 of the Sales Order # 4969 is externally procured or sent from our own warehouse ? Give the reasons for your answer.
    Answer: The schedule line category is CP and line item category is TAN

    H.Can you find out the Movement type associated with Line Item. 10 of the SAP Sales Order # 4969 directly from the Sales Order without going to the Goods Issue Document ?
    Answer: PATH—Goto–item–schedule lines NOW LOOK AT THE BOTTOM OF THE DOCUMENT THREE TABS Sale–Shipping–Procurement CHOOSE the Procurement tab — you can find movement type 601

    Like

  20. Mrunal says:

    Ans1 : New category ZF created.
    Ans2: Assigned ZF to TAN, CP, MRP type PD.
    Ans3: 14472 created. Changed the SLC to ‘ZF’
    Ans4: Material MMM-01-2 created. With no MRP1 tab. When creating a new order I get a message “ Material MMM-01-2 not defined for sales org 1000, dist ch 10 language DE’

    Like

  21. justin says:

    ANSWERS:

    A:Configure a new schedule line category say ‘Zx’ as a copy of the standard schedule line category ‘CP’ ?
    New schedule line category ZL created.
    ____________________________________________________________________
    B.Configure the schedule line category ‘Zx’ you have created in Q.1 above to be determined manually for sales item category TAN and material M-01.

    Assigned TAN + PD=ZL
    __________________________________________________________________
    C.Create a standard sales order for a material M-01 and change the schedule line category to ‘Zx’ and write down the standard order

    Order 14470 has been created .
    (when assigned Tan and Pd to ZL normally the Schedule line category automatically changed to ZL)
    __________________________________________________________________
    D.Create a material similar to M-01 using the SAP Material Master ( This time without a MRP Type ) and create another standard order with the new material and identify the schedule line category determined by default. Explain the reasons for the determination. ( Hint: If the material is not in the SAP Material Listing and Exclusion, please add the same)

    Created a material JUS-01 of the type M-01 .
    order 14471 was created .
    The schedule line category by default was CP.
    REASON:

    (By default it has chosen CP because the item category is TAN which is because when creating material JUS-01 the Item category group in Sales org2 was “norm” ,which is a standard order.
    __________________________________________________________________
    E.Deliver the order you have created in Q. 4 above and write down the Movement type associated with the corresponding item in the delivery

    created order 14474 and delivered 80016680 and the movement type is 601
    __________________________________________________________________
    F.Give the goods movement type associated with the SAP Sales Order # 4969 , Item No. 10
    the movement type is 601
    __________________________________________________________________
    G.Can you determine if the line item.10 of the Sales Order # 4969 is externally procured or sent from our own warehouse ? Give the reasons for your answer

    REason : It is sent from the warehouse this is because of no purcase request on the purchase column , the schedule line catergory is CP,line item category is TAN
    __________________________________________________________________
    H.Can you find out the Movement type associated with Line Item. 10 of the SAP Sales Order # 4969 directly from the Sales Order without going to the Goods Issue Document ?

    yes
    (Go to schedule line ,double click the line item ,and under the procurement tab ,under material management ,you could find the movement type).

    Like

  22. justin says:

    hi siva ,

    Could be please check the answers for D,G and H

    In question D – you have mentioned
    “( This time without a MRP Type ) ”
    and “( Hint: If the material is not in the SAP Material Listing and Exclusion, please add the same)”

    I could not understand what you have mentioned …. pls do explain.

    thanks

    Like

  23. Mrunal says:

    Ans4: continued..

    After some research and trial and error was able to create a new SO # 14482. “CP” is sch lin categ for this order. Item MMM-01-2 is created without a MRP type and item category is ‘TAN’. Sch Line Categ is determined by Item Categ + MRP type. In the assignment table for Tan + no MRP the sch line categ is CP.

    Like

  24. Mrunal says:

    Ans5: New order created with 14503 item MMM-01-2. 80016700 created. Movement type is 601 on the Movement type data tab.
    Ans6: 601
    Ans7: Picked from own warehouse as the field ‘OverallWMstatus’ is blank and states ‘ No WM trnfs order required’.
    Ans8: Yes, Procurement tab on schedule line screen.

    Like

  25. Indira says:

    A.Configure a new schedule line category say ‘Zx’ as a copy of the standard schedule line category ‘CP’ ?

    Ans. Created schedule line ZI as a copy of CP.

    B.Configure the schedule line category ‘Zx’ you have created in Q.1 above to be determined manually for sales item category TAN and material M-01.

    Ans. Assigned TAN+PD –> ZI

    C.Create a standard sales order for a material M-01 and change the schedule line category to ‘Zx’ and write down the standard order

    Ans. Created Standard order # 14799 with schedule line ZI.

    D.Create a material similar to M-01 using the SAP Material Master ( This time without a MRP Type ) and create another standard order with the new material and identify the schedule line category determined by default. Explain the reasons for the determination. ( Hint: If the material is not in the SAP Material Listing and Exclusion, please add the same)

    Ans. Created material Ind14790 without MRP and created sales order # 14800 for the same material.

    The default Schedule line was “CP” since the material has been created as a copy of M-01 for which the item category is TAN by default.

    E.Deliver the order you have created in Q. 4 above and write down the Movement type associated with the corresponding item in the delivery .

    Ans. Created delivery #80016794 & the movement type is 601.

    F.Give the goods movement type associated with the SAP Sales Order # 4969 , Item No. 10

    Ans. Movement type is 601.

    G.Can you determine if the line item.10 of the Sales Order # 4969 is externally procured or sent from our own warehouse ? Give the reasons for your answer.

    Ans. The line item has been sent from the warehouse since the schedule line is “CP” for the item category TAN.

    H.Can you find out the Movement type associated with Line Item. 10 of the SAP Sales Order # 4969 directly from the Sales Order without going to the Goods Issue Document ?

    Ans. Yes. under the “procurement” tab of the schedule line screen.

    Like

  26. Jitesh says:

    1. Configure a new schedule line category say ‘Zx’ as a copy of the standard schedule line category ‘CP’ ?

    • Created Schedule line category ZJ as a copy of CP.

    2. Configure the schedule line category ‘Zx’ you have created in Q.1 above to be determined manually for sales item category TAN and material M-01.

    • By using schedule line determiation (vov5): A(item category TAN)+ B(MRP type from mat master MRP 1 view) = CP +YJ(manually)

    3. Create a standard sales order for a material M-01 and change the schedule line category to ‘Zx’ and write down the standard order

    • Created 14020/or for material M-01 and used schedule Line Category YJ.

    4. Create a material similar to M-01 using the SAP Material Master ( This time without a MRP Type ) and create another standard order with the new material and identify the schedule line category determined by default. Explain the reasons for the determination. ( Hint: If the material is not in the SAP Material Listing and Exclusion, please add the same)

    • Created material M-57 as a copy of M-01. created order 14021 > schedule line category for this order is CP it derives from Item category TAN. as we copied the material from M-01 so it takes the value automatically..

    5. Deliver the order you have created in Q. 4 above and write down the Movement type associated with the corresponding item in the delivery .

    • Created delivery 80015868. movement type used associated with corresponding item(Tan) is 601(goto movement type tab)

    6. Give the goods movement type associated with the SAP Sales Order # 4969 , Item No. 10

    • 601. go to schedule line at item level 10 and then select procurement tab at bottom right hand side of the screen.

    7. Can you determine if the line item.10 of the Sales Order # 4969 is externally procured or sent from our own warehouse ? Give the reasons for your answer.

    • Its sent from our own warehouse . goto the schedule line category CP by using vov6 .

    8. Can you find out the Movement type associated with Line Item. 10 of the SAP Sales Order # 4969 directly from the Sales Order without going to the Goods Issue Document ?
    • 601 through procurement.

    Like

  27. SYED SHAH says:

    Questions :
    1. Configure a new schedule line category say ‘Zx’ as a copy of the standard schedule line category ‘CP’ ?
    Schedule Line Category UP Created
    2. Configure the schedule line category ‘Zx’ you have created in Q.1 above to be determined manually for sales item category TAN and material M-01.
    Order 13381 C
    3. Create a standard sales order for a material M-01 and change the schedule line category to ‘Zx’ and write down the standard order
    Order 13381 Created
    4. Create a material similar to M-01 using the SAP Material Master ( This time without a MRP Type ) and create another standard order with the new material and identify the schedule line category determined by default. Explain the reasons for the determination. ( Hint: If the material is not in the SAP Material Listing and Exclusion, please add the same)
    Order 13382 created. The default Schedule line was “CP” since the material has been created as a copy of S-01 for which the item category is TAN by default
    5. Deliver the order you have created in Q. 4 above and write down the Movement type associated with the corresponding item in the delivery .
    Delivery 80016249 created. Goods Movement type 601.
    6. Give the goods movement type associated with the SAP Sales Order # 4969 , Item No. 10
    It is 601.
    7. Can you determine if the line item.10 of the Sales Order # 4969 is externally procured or sent from our own warehouse ? Give the reasons for your answer.
    It is shipped from our warehouse. Reason # 1: Schedule line category is CP. Also, in the document flow, there is no Purchase Order issued.
    8. Can you find out the Movement type associated with Line Item. 10 of the SAP Sales Order # 4969 directly from the Sales Order without going to the Goods Issue Document ?
    Yes, Go to Schedule Lines for the item, Double click the item and Go to Procurement Tab.

    Like

  28. Muthu says:

    A.Configure a new schedule line category say ‘Zx’ as a copy of the standard schedule line category ‘CP’ ?
    ZY created as a copy.
    B.Configure the schedule line category ‘Zx’ you have created in Q.1 above to be determined manually for sales item category TAN and material M-01.
    mrp type for M-01 is PD.
    So, TAN+PD = ZY
    C.Create a standard sales order for a material M-01 and change the schedule line category to ‘Zx’ and write down the standard order
    135199
    D.Create a material similar to M-01 using the SAP Material Master ( This time without a MRP Type ) and create another standard order with the new material

    and identify the schedule line category determined by default. Explain the reasons for the determination. ( Hint: If the material is not in the SAP Material

    Listing and Exclusion, please add the same):
    M24 Created.Since there is no MRP type , the item category(TAN) determines the schedule line category.(cp)
    E.Deliver the order you have created in Q. 4 above and write down the Movement type associated with the corresponding item in the delivery .
    80016384 / 601
    F.Give the goods movement type associated with the SAP Sales Order # 4969 , Item No. 10
    601
    G.Can you determine if the line item.10 of the Sales Order # 4969 is externally procured or sent from our own warehouse ? Give the reasons for your answer.
    No.It is not externally procured.No PO req was triggered and the schedule line category used is CP , which does not have a PO type code set.
    Created an order with item category TAS (3rd party) ,135202 ,which triggers a Purchase req.CP is the default schedule line category that gets picked up.
    H.Can you find out the Movement type associated with Line Item. 10 of the SAP Sales Order # 4969 directly from the Sales Order without going to the Goods
    Issue Document ?
    Yes.From the procurement tab for that schedule line.

    Like

  29. Edward Emmory says:

    Questions :
    1. Configure a new schedule line category say ‘Zx’ as a copy of the standard schedule line category ‘CP’ ?
    Answer: ZE
    2. Configure the schedule line category ‘Zx’ you have created in Q.1 above to be determined manually for sales item category TAN and material M-01.
    Answer: done
    3. Create a standard sales order for a material M-01 and change the schedule line category to ‘Zx’ and write down the standard order
    Answer: 135285
    4. Create a material similar to M-01 using the SAP Material Master ( This time without a MRP Type ) and create another standard order with the new material and identify the schedule line category determined by default. Explain the reasons for the determination. ( Hint: If the material is not in the SAP Material Listing and Exclusion, please add the same)
    Answer: created material 1729 with MRP type (ND: No Planning), Order 135287 created. The default Schedule line was “CN” since MRP type is ND and as such the new schedule line created is not assigned for TAN and the ND schedule line, so the new schedule line ZE not added manually
    5. Deliver the order you have created in Q. 4 above and write down the Movement type associated with the corresponding item in the delivery .
    Answer: Delivery 80016398 created. Goods Movement type is: 601
    6. Give the goods movement type associated with the SAP Sales Order # 4969 , Item No. 10
    Answer: Move. type is: 601
    7. Can you determine if the line item.10 of the Sales Order # 4969 is externally procured or sent from our own warehouse ? Give the reasons for your answer.
    Answer: It is shipped from our warehouse. Reason # 1: it is our shipping point, Schedule line category is CP. Also, in the document flow, there is no Purchase Order issued.
    8. Can you find out the Movement type associated with Line Item. 10 of the SAP Sales Order # 4969 directly from the Sales Order without going to the Goods Issue Document ?
    Answer: Yes, Go to Schedule Lines for the item, select schedule line and Go to Procurement Tab.

    Like

  30. Habib says:

    1. Configure a new schedule line category say ‘Zx’ as a copy of the standard schedule line category ‘CP’ ?
    Ans: Schedule Line Category Z2 created
    2. Configure the schedule line category ‘Zx’ you have created in Q.1 above to be determined manually for sales item category ZHAN and material M-01.
    Ans: Z2 has been assigned to ZHAN item category
    3. Create a standard sales order for a material M-01 and change the schedule line category to ‘Zx’ and write down the standard order
    Ans: Standard Order – HA 135290
    4. Create a material similar to M-01 using the SAP Material Master ( This time without a MRP Type ) and create another standard order with the new material and identify the schedule line category determined by default. Explain the reasons for the determination. ( Hint: If the material is not in the SAP Material Listing and Exclusion, please add the same)
    Ans: Standard Order – HA 135289, Created Material H-01. The schedule line determined by default was Z2 because of the respective Sch. Line Assignment which states that Item Cat ZHAN and No MRP type should be Z2. While with material M-01, the schedule line determined was CP due to the combination of the MRP type PD (Material Master) and Item Cat ZHAN
    5. Deliver the order you have created in Q. 4 above and write down the Movement type associated with the corresponding item in the delivery.
    Ans: LF # 80016399, PGI # 4900000163, Movement Type #601
    6. Give the goods movement type associated with the SAP Sales Order # 4969 , Item No. 10
    Ans: Movement Type is 601, which was derived from schedule line item cat CP
    7. Can you determine if the line item.10 of the Sales Order # 4969 is externally procured or sent from our own warehouse ? Give the reasons for your answer.
    Ans: The item was sent from our warehouse because a transfer order process took place, in which the Item was picked from plant 1000, storage location 0001. An external procurement would have generated a purchase requisition number which can be view from the Schedule Line tab in the header document of the sales order 4969
    8. Can you find out the Movement type associated with Line Item. 10 of the SAP Sales Order # 4969 directly from the Sales Order without going to the Goods Issue Document ?
    Ans: The movement type is associated with the delivery process,it cannot be seen from the Sales Order document but can be viewed from the delivery document or Goods Issue Document

    Like

  31. zaheer says:

    A. Configure a new schedule line category say ‘Zx’ as a copy of the standard schedule line category ‘CP’ ?

    Answer:

    I have created schedule line zl which is a copy of cp

    B. Configure the schedule line category ‘Zx’ you have created in Q.1 above
    to be determined manually for sales item category TAN and material M-01.

    C. Create a standard sales order for a material M-01 and change the
    schedule line category to ‘Zx’ and write down the standard order

    Answer:

    I have assigned zl as the manual item category for material m-01 and item category TAN but it is not working, when I try to enter zl as the manual schedule line I get this error that schedule line is not defined

    D. Create a material similar to M-01 using the SAP Material Master ( This time without a MRP Type ) and create another standard order with the new material and identify the schedule line category determined by default. Explain the reasons for the determination. ( Hint: If the material is not in the SAP Material Listing and Exclusion, please add the same)

    Answer:
    I have Created a material make similar to m-01 without MRP type, I have created standerd order with the new material and identified the default schedule line category as CP. Reason for the determination is item category TAN, for item category TAN the default schedule line is CP and because MRP is not included in material master so only item category can determine the schedule line.

    After the above given scenario I have made few adjustment in material master and assigned z12 which is my own item category as the default item category, I have assigned cp as the default schedule line and zl as the manual schedule line, based on this new setting I have created a sale order #25612 and everything is working perfectly, the default schedule line is cp and I can change it to zl manually.

    E. Give the goods movement type associated with the SAP Sales Order # 4969 , Item No. 10

    Answer: Movement type of the item is 601

    The item is not relevant for external procurement because in the schedule line category CP there is no PO Type, Item Category and Account Assignment.

    F. Can you find out the Movement type associated with Line Item. 10 of the SAP Sales Order # 4969 directly from the Sales Order without going to the Goods Issue Document ?

    Yes we can find movement type associated with the line item by clicking schedule line— procurement tab

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s